Skip to content
LEVENT MARINE
Back to services
ER fixed protection · Annual flow test · Solenoid

Water Mist System

Engine-room high-pressure water-mist systems — pump pressure drift, nozzle clogging, section valve solenoid failures. Annual discharge & flow test, class survey reports.

Service available at all US ports — 24/7 worldwide. Our next available technician contacts you within 1 hour.

Symptom checklist

What we hear from the bridge.

  • Section valve solenoid drops out when pump starts
  • Pump skid cannot hold 140 bar standby pressure
  • Local control panel shows nozzle-test pressure below threshold
  • Annual flow test fails on one zone only
Likely root causes

Where the fault usually lives.

  • Section solenoid coil insulation breakdown
  • Strainer choked by sea-water deposits
  • Nozzle internal swirl chamber corrosion
  • Pump cavitation after suction-line leak
Equipment we bring

Calibrated test equipment, class-acceptable reports.

  • HI-FOG / Marioff service manual + pressure-decay test kit
  • Strainer-cleaning tool
  • Insulation tester (Megger MIT525)
  • Manometer 0-160 bar, class-witnessed test sheet

Reports compatible with DNV · BV · ABS · Lloyd's · TL · RINA · ClassNK · IRS.

Often needed together

Parts most often requested with this service.

  • water mist nozzles
  • solenoid valves
  • high pressure strainers
FAQ

Common questions for this system.

Which engine-room water-mist systems do you service?
Marioff HI-FOG OEM-grade service on the GPU pump skid (electric and diesel-driven), section selector solenoid valves, accumulator pre-charge and the dedicated detection panel. Also Ultra Fog and Tyco AquaMist installations. We pressure-test the high-pressure piping to 140 bar with a calibrated Druck DPI 705E reference, replace clogged spray heads, and verify section valve actuation against the detection panel cause-and-effect matrix per FSS Code Ch 7.
How long does the annual water-mist discharge test take?
The annual is six to eight hours alongside: pump skid start sequence verified (electric primary, diesel back-up auto-cut), accumulator pressure logged, one ER section discharged to a temporary catch tray to confirm nozzle pattern, the other sections actuated dry to confirm valve operation. Pre-charge nitrogen is topped up, filters changed, and the system is left armed with the Master Fire Safety Plan signed off by the Chief Engineer and the attending surveyor.
Do you coordinate the discharge test with the class surveyor?
Yes. The annual water-mist discharge is a witnessed test for DNV, BV, ABS, Lloyd's Register, ClassNK, RINA, TL and IRS. We pre-attend the day before to clear nozzles, check pump and detection panel, then time the live discharge for the surveyor's arrival window. The report references FSS Code Ch 7 and MSC/Circ.1165, attaches the Druck pressure test record and a photo of each restored section with its locking pin re-inserted.

Have a vessel calling?

Three quick questions — port, when, contact. Our next available technician will contact you within 1 hour.